Budgets
Every task has a budget in credits, an estimate before it starts, and a hard stop.
Every task has a budget. The agent cannot start a task without one, and stops when it reaches it.
- Before starting, it estimates the cost as a range («between 8 and 15 credits»).
- While working, it shows what each step spent: model use and sandbox time.
- At 80 %, it tells you, and says what is left to do.
- At 100 %, it stops. The work so far is saved on its branch, with a summary of what remains; you can raise the budget and continue.
In Sypnia Cloud the budget is in credits, prepaid: you top them up (with PayPal) and tasks spend from them; nothing is billed afterwards. In your terminal with your own model key, the budget is counted in your provider’s tokens.
Teams set a default budget and a maximum per task; a person can lower them, never raise them past the team’s maximum.